III. The Drilling-1

2470 Words

III. The Drilling I Once more the valleys and gorges of Guadalupe Grade resounded to the flying echoes of honking horns. This time it was not one car, but a whole fleet of them, a dozen seven-ton trucks, broad and solid, with broad and solid double wheels, and trailers on behind, that carried even more tons. The first load towered high, a big stationary engine, held in place by heavy timbers bolted fast at the sides; that truck went carefully round the curves, you bet! Behind it came the “mud-hogs” and the “draw-works”; and then the “string” of drilling tools, hollow tubes of the best steel, that were screwed end to end and went down into the earth, a mile or more, if need be. These tubes extended over the end of the trailers, where red flags waved in warning; on the short curves they sw

Free reading for new users
Scan code to download app
Facebookexpand_more
  • author-avatar
    Writer
  • chap_listContents
  • likeADD