The emergency injunction hearing was scheduled for two in the afternoon. Tomilola's lawyer filed the opposition at eleven-forty-seven and had it in front of the duty judge by noon. The grounds were the same as the previous opposition — the third emergency legal action in ten days by the same entity, a pattern of procedural obstruction designed to delay a state safety inspection of an unlicensed facility. The unlicensed sublevel was the key. Nadia had found it through the city's structural permit database at ten-fifteen. The south rail yard facility held a state occupancy permit for the above-ground floors. The permit documented the building's licensed square footage. Nadia had cross-referenced that figure against the building's external dimensions using the city's infrastructure mapping

