Seren took the first major milestone packet into the field rather than reviewing it from the checkpoint office. Marker nineteen sat on a wet curve where runoff crossed beneath the road before dropping toward the trees. A Blackridge verifier was measuring the repaired drainage channel while a Silvercrest inspector checked the reinforcement line on the uphill side. The current work passed the first physical checks. Seren opened the historical packet beside it. The old maintenance entry claimed the same drainage channel had been cleared, reshaped, and reinforced during the previous cycle. A contractor sign-off sat behind it. The material issue showed reinforcement mesh released against the work order. The before-repair photographs from the current cure showed debris packed into the chann

